Flow Optimisation Project
Brief
At a flow interconnect point, several different streams come together flowing in various directions that taken together, net off against each other and have different operational trigger points. Prior to the Flow Optimisation Project, path flows and capacities were manually calculated periodically based on usage requirements.
Problems
This created the following problems for the company
Revenue lost due to non-optimised path flow calculations
Time delay on flow while manual calculations were completed and reviewed
Regular calculation errors
No integration with existing operational systems
Solution
A calculator was created that drew information directly from the customer facing system. This created a 1 button solution for the company, where 1 button was pressed, a brief sub 30 second calculation is completed with the flow and operational state being output.